Skip to content

drop: 2026-06-01 — ikea-assembly-manual#116

Merged
github-actions[bot] merged 1 commit into
mainfrom
cycle/2026-06-01
Jun 2, 2026
Merged

drop: 2026-06-01 — ikea-assembly-manual#116
github-actions[bot] merged 1 commit into
mainfrom
cycle/2026-06-01

Conversation

@github-actions
Copy link
Copy Markdown
Contributor

@github-actions github-actions Bot commented Jun 2, 2026

Drop: ikea-assembly-manual

The drop reads as a flat-pack assembly instruction manual for ROOT-2015 (the model year, est. 2015): cover, before-you-begin spec page, tools-required page (the team, each rendered as a labeled tool), three parts-inventory sheets (all 63 portfolio companies as part numbers with brand-anchor line drawings), an assembly procedure tying mission and check size into steps, a warranty card with the contact mailto and the open Associate role, and a final 'other models in this catalogue' sheet. The voice is deadpan-IKEA: short captions, Swedish-style section labels in the corner marks, no marketing prose. All 63 portfolio companies are included; the team is rendered as tools T-01 through T-07 by name; firm.name, tagline ('Seeding bold engineers'), mission, and thesis all appear in the static DOM. No omissions.

Where the facts live

  • Firm name: .wordmark on the cover sheet (Sheet 1) and in the warranty footer rule
  • Mission: .copy .mission on Sheet 2 ('Before you begin'), with thesis directly below
  • Portfolio: Three .parts-list sections on Sheets 4, 5, 6 (P-001 through P-063), each a real anchor to the company URL
  • Team: Seven .tool entries on Sheet 3 (T-01 through T-07), each with name, title, and bio
  • Contact: mailto:hello@root.vc inside .meta-list on Sheet 8 and again on the application line; address printed in footer rule on Sheet 9

History entrance

Sheet 9, 'Other models in this catalogue,' is a two-tab binder: one tab labeled 'Open the binder → previous manuals' and one labeled 'Last week's model.' Both are large, hover-active anchors pointing to /archive/. The tab markup mirrors the binder tabs you'd flip on a catalogue spine — in-world for a printed instruction series, not a footer link.

Tweet draft

We rewrote root.vc as the flat-pack assembly instructions for a venture fund. Parts list: all 63 portfolio companies. Tools required: the team. Some assembly required. Engineers needed. root.vc

Screenshot brief

Lead screenshot: Sheet 1 (cover) showing the Root Ventures wordmark, the labeled line drawing of an assembled fund, and the yellow 'SOME ASSEMBLY REQUIRED' warning strip. Second screenshot: Sheet 3 (tools required) showing the seven partners as numbered tools T-01 through T-07. Optional third: a parts-inventory sheet with part numbers P-001 through P-022 visible, to show how the portfolio is rendered.


This PR was generated by the weekly AI reinvention cycle. Once CI is green and main hasn't moved, it auto-merges.

Live preview

@vercel
Copy link
Copy Markdown

vercel Bot commented Jun 2, 2026

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
cli-website Ready Ready Preview, Comment Jun 2, 2026 12:00am

@github-actions github-actions Bot merged commit cbd4b0b into main Jun 2, 2026
1 of 2 checks passed
@github-actions github-actions Bot deleted the cycle/2026-06-01 branch June 2, 2026 00:00
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants